Home>News>How to do the maintenance work of the vertical roller mill

How to do the maintenance work of the vertical roller mill

If you are interested in our products, Please get in contact with us .

E-mail: shuguang_mill@163.com Chat Line Send Inquiry

No matter what the service life of the equipment is limited, if we do not pay attention to it in daily use, it will shorten its service life and enter the scrapped state in advance. Therefore, in order to extend the service life of the vertical roller mill, the key is maintenance. The following are some of the details of the maintenance of vertical roller mill summarized by Shuguang.

 

1. The operator is a relatively close contact with the vertical roller mill, and they can affect it directly.So,before they operating the euqipment,they should undergo strict training before they can,Which

can ensure the effective and stable production and reduce the damage of the equipment. 

 

2.The working environment of the vertical roller mill should pay attention to avoid open-air production, exposure to the sun, rain.Because rain will cause different degrees of damage to the roller mill, if the water in the body, the effect is even worse.The surface of the roller mill must be coated with rust-proof grease, rust should be treated immediately and rust-preventing measures should be taken.

 

3.Vertical roller mill accessories should also be regular inspected.From the outside to the inside one by one, the vertical roller mill components are listed in a list, be ware of the omission phenomenon.Once finding serious parts ,we need to be replaced in time, and loose bolts or missing need to be filled and tightened.

 

4. The lubrication work of the transmission parts in the vertical roller mill machine parts must be in place. The addition of lubricants is not easy or too little. The selection of lubricants in winter and summer should be correct, and the cleaning work of this part must be paid attention to. Impurities can contaminate the lubricant and affect its lubricating effect. Regularly clean and add new lubricant according to the working strength.

 

5.The working time of the vertical roller mill should be well planned, try to avoid overworked work, labor operation is not only low production efficiency, huge damage to the machine, is one of the killers to shorten the service life.

 

6. The amount of material added in the production process and the moisture content of the material should be controlled within the effective range. The size and amount of material particles have certain wear and tear on the vulnerable parts of the roller grinding ring. The material with excessive humidity is not easy to grind directly, which will not only cause blockage, but also possibly rust the internal parts.

Factory Address: Longjiang West Road, Shangjie District, Zhengzhou City

Contact number: +86-371-67666660 676667

Mobile phone: 0086 13523465141

After-sales Service Department: 0371-67666667


Send Inquiry

We guarantee that your information will not be divulged to third parties and reply to you within 24 hours.

Please enter your demand such as Raw material type, Capacity, Feeding material size, Final product size, etc. To become our quality clients will have access to a discount of contract!

  • Product Name
  • Your Name
  • Your Email
  • Your Phone
  • Requirements

Hot Products