E-mail: shuguang_mill@163.com Chat Line Send Inquiry1. The main shaft base bearing and fan bearing are injected with grease gun 5# calcium base grease once every 10 days, and the analyzer bearing is broken off once every two months, with the addition of 5# calcium base grease.
2. No metal block is allowed to enter the machine. If it is found, it should be shut down immediately.
3. The feeding should be uniform, not more or less.
4, preventive maintenance, at the same time of roller shovel knife of ring parts for repair replacement, roller device is in use for connecting bolt and nut should be examined before and after, see if any loose phenomenon, lubricating oils are added.
The 5 roller mill device should be replaced with the grinding roller for more than 500 hours, and the roller bearings must be cleaned, and the damaged parts should be replaced in time.